FOB Reference Price:Get Latest Price
Offer Ability:5 000MT/Per Month EN10028-3 P460NL2 pressure vessel steel plate
P460NL2 steel grade is one of grade in En10028-3, which is non alloy and alloy steels with specified elevated temperature properties. P460NL2 grades are used above all for manufacturing boilers, pressure vessels and pipes transporting hot liquids.
Low temperature impacting test for boiler steel plate P460NL2 shall be under minus 50 cent degree when rolling.
EN10028-3 P460NL2 steel Chemical Composition (%):
Grade |
Chemical Composition (%) |
||||
C |
Mn≥ |
Si |
P |
S |
|
EN10028-3 P460NL2 |
0.20 |
1.1-1.7 |
0.6 |
0.020 |
0.010 |
EN10028-3 P460NL2 steel Mechanical Property:
Grade |
Mechanical Property |
|||
Tensile Strength (MPa) |
Yield Strength (MPa) |
% Elongation in 2 in.(50mm) min |
Impacting Test Temperature(°C) |
|
EN10028-3 P460NL2 |
540-720 |
460 |
17 |
-20/0/-20/-40/-50 |
BBN Steel is specializing in EN10028-3 P460NL2 pressure vessel steel plate which is under EN specification.EN10028-3 P460NL2 pressure vessel steel plate has excellent mechanical properties and widely application. Combining above advantages can be supplied the most in line with customer requirements products. Moreover,we will provide cutting, pretreatment, galvanizing, testing, heat treatment services for EN10028-3 P460NL2 pressure vessel steel plate.If you want to known EN10028-3 P460NL2 pressure vessel steel plate more information,welcome to contact with us at any time: [email protected].
1.Additional Condition: UT(Ultrasonic examination), AR(As Hot Rolled only), TMCP(Thermal Mechanical Control Processing), N(Normalized), Q+T(Quenched and Tempered),Z Direction Test(Z15,Z25,Z35), Charpy V-Notch Impact Test, The Third Party Test (such as SGS Test), Coated or Shot Blasting and Painting.
2.Shipping department: a).Book shipping space b).Documents confirmation c).Shipping track d).Shipping case
3.Production control department: a).Technical evaluation b).Production Schedule c).Production Tracking d).Successfully complaint case
4.Quality control: a).Test in mill b).Inspection before Shipment c).Third Party Inspection d).About Package problem e).Quality problem case
5.Customers’ feedback and complaint: a).Quality feedback b).Service feedback c).Complaint d).Case