Offer Ability:5 000MT/Per Month EN10028-3 P275N Pressure Vessel steel
EN10028-3 P275N pressure vessel steel plate is the room temperature quality, P275NH is for the elevated temperature quality, P275NL1 is for the low temperature quality and P275NL2 is for the special low temperature quality.
Main chemical elements composition of P275N:
Main chemical elements composition of P275N |
|||||||
C |
Si |
Mn |
P |
S |
Al (total) |
N |
Cr |
0.16 |
0.40 |
0.80-1.50 |
0.025 |
0.015 |
≥0.020 |
0.012 |
0.30 |
Cu |
Mo |
Nb |
Ni |
Ti |
V |
Nb+Ti+V |
|
0.30 |
0.08 |
0.05 |
0.50 |
0.03 |
0.05 |
0.05 |
EN10028-3 P275N Mechanical Property:
Thickness(mm) |
Yield strength (≥Mpa) |
Tensile strength (Mpa) |
Elongation in ≥,% |
T≤16 |
275 |
390-510 |
24 |
16<T≤40 |
265 |
||
40<T≤60 |
255 |
||
60<T≤100 |
235 |
370-490 |
23 |
100<T≤150 |
225 |
360-480 |
|
150<T |
215 |
350-470 |
Application:
EN10028-3 P275N Pressure Vessel and Boiler Steel Plate are used in Pressure Vessel, Boiler, Storage Tanks and Heat Exchanger in Oil, Gas Project.
BBN Steel is specializing in EN10028-3 P275N Pressure Vessel steel which is under EN specification.EN10028-3 P275N Pressure Vessel steel has excellent mechanical properties and widely application. Combining above advantages can be supplied the most in line with customer requirements products. Moreover,we will provide cutting, pretreatment, galvanizing, testing, heat treatment services for EN10028-3 P275N Pressure Vessel steel.If you want to known EN10028-3 P275N Pressure Vessel steel more information,welcome to contact with us at any time: [email protected].
1.Additional Condition: UT(Ultrasonic examination), AR(As Hot Rolled only), TMCP(Thermal Mechanical Control Processing), N(Normalized), Q+T(Quenched and Tempered),Z Direction Test(Z15,Z25,Z35), Charpy V-Notch Impact Test, The Third Party Test (such as SGS Test), Coated or Shot Blasting and Painting.
2.Shipping department: a).Book shipping space b).Documents confirmation c).Shipping track d).Shipping case
3.Production control department: a).Technical evaluation b).Production Schedule c).Production Tracking d).Successfully complaint case
4.Quality control: a).Test in mill b).Inspection before Shipment c).Third Party Inspection d).About Package problem e).Quality problem case
5.Customers’ feedback and complaint: a).Quality feedback b).Service feedback c).Complaint d).Case