FOB Reference Price:Get Latest Price
Offer Ability:5 000MT/Per Month ASTM A240 310S (0Cr25Ni20) stainless steel plate
310S stainless steel is austenitic chrome-nickel stainless steel with good oxidation resistance and corrosion resistance because of the higher percentage of chromium and nickel.
ASTM A240 310S steel has much better creep strength, can continue to operate at high temperatures and has good high temperature resistance.
ASTM A240 310S stainless steel Chemical Composition:
Grade |
C |
Si |
Mn |
P |
S |
Ni |
Cr |
A240 310S |
≤0.08 |
≤1.500 |
≤2.00 |
≤0.035 |
≤0.030 |
≤19.00-22.00 |
≤24.00-26.00 |
ASTM A240 310S stainless steel Mechanical properties:
Grade |
Tensile strength (бb) (Mpa) |
Yield strength (σs) (Mpa) |
Area reduction (ψ)% |
A240 310S |
≥ 520 |
≥ 205 |
≥50 |
ASTM A240 310S stainless steel Heat treatment:
Tempering: 180~200
Annealing condition, ≤207HB, indentation diameter ≥ 4.20mm
Quenching, ≥62HRC
310S stainless steel application:
Stamping dies, fixtures, tools, gauges, cutters, auxiliary tools, etc.
BBN Steel is specializing in ASTM A240 310S (0Cr25Ni20) stainless steel plate which is under ASTM specification.ASTM A240 310S (0Cr25Ni20) stainless steel plate has excellent mechanical properties and widely application. Combining above advantages can be supplied the most in line with customer requirements products. Moreover,we will provide cutting, pretreatment, galvanizing, testing, heat treatment services for ASTM A240 310S (0Cr25Ni20) stainless steel plate.If you want to known ASTM A240 310S (0Cr25Ni20) stainless steel plate more information,welcome to contact with us at any time: [email protected].
1.Additional Condition: UT(Ultrasonic examination), AR(As Hot Rolled only), TMCP(Thermal Mechanical Control Processing), N(Normalized), Q+T(Quenched and Tempered),Z Direction Test(Z15,Z25,Z35), Charpy V-Notch Impact Test, The Third Party Test (such as SGS Test), Coated or Shot Blasting and Painting.
2.Shipping department: a).Book shipping space b).Documents confirmation c).Shipping track d).Shipping case
3.Production control department: a).Technical evaluation b).Production Schedule c).Production Tracking d).Successfully complaint case
4.Quality control: a).Test in mill b).Inspection before Shipment c).Third Party Inspection d).About Package problem e).Quality problem case
5.Customers’ feedback and complaint: a).Quality feedback b).Service feedback c).Complaint d).Case